AFI is pleased to have recently completed an emergency installation of a foam deluge system at an underground mine. The deluge system was severely damaged by mining equipment and production was ceased until a retrofitted system could be designed, fabricated, installed and commissioned. AFI worked around the clock and together with our partners implemented a design optimised on schedule to complete the works in the shortest possible duration, enabling production to recommence.